New York Harbor once held some 350 square miles of oyster beds, by the most often cited estimate, and the last of them closed in 1927. That history is told in the city that ran on oysters. The Billion Oyster Project, founded in 2014 at the Harbor School on Governors Island, is trying to bring oyster reefs back, with a target of one billion oysters and one million students by 2030.1 Its own monitoring shows how far it has come, and how far there is to go.
What Has Been Done
By the end of 2025 the project had restored more than 180 million oysters to the harbor and collected 3.2 million pounds of shell from restaurants to build reefs, and more than 40,000 New York students had taken part.2 About 80 restaurants take part in its shell recycling.1 The project lists around 70 million oysters introduced in the Lower Harbor and Raritan Bay, the area that includes the Living Breakwaters, a set of offshore structures off Staten Island.3 Whether shell recycling pays off is asked in does shell recycling work?
What the Monitoring Shows
In 2025 the team monitored 12 restoration sites across four waterbodies and counted and measured 14,000 oysters. The oysters are growing: average shell heights passed 160 mm at Bush Terminal Park and 147 mm at Head of Bay. Some sites now hold large populations, around 10.5 million oysters at Brooklyn Bridge Park and 13.8 million at Head of Bay. The reefs are also attracting life: more than 580 trap deployments recorded over 4,000 fish, crabs, shrimp and other animals from 44 different taxa.2
| Billion Oyster Project, end of 2025 | Figure |
|---|---|
| Oysters restored (cumulative) | 180 million+ |
| Shell collected from restaurants | 3.2 million pounds |
| Restoration sites monitored | 12 |
| Largest site populations | Head of Bay ~13.8M; Brooklyn Bridge Park ~10.5M |
| Animal taxa recorded on reefs | 44 |
| Reefs self-sustaining? | Not yet |
NYC Oyster Monitoring Report 2025, Billion Oyster Project.2
The Hard Part
The test of a restored reef is whether it can replace itself. Wild oyster larvae did settle at several sites in 2025, including Soundview Park, Brooklyn Bridge Park and the Living Breakwaters. But the report is clear that recruitment "remains low and highly variable, and does not currently outweigh mortality". The reefs have not yet reached self-sustaining population dynamics, and continued reseeding by people is still necessary.2
Ten years in, the project has shown that oysters can grow and gather marine life in the harbor again. Whether the reefs can rebuild themselves is the open question. Europe is asking the same question of its flat oyster reefs, and coastal engineers of reefs used as sea walls.
- Billion Oyster Project. "About." billionoysterproject.org
- Billion Oyster Project. "NYC Oyster Monitoring Report: 2025." billionoysterproject.org
- Billion Oyster Project. "Oyster Restoration." billionoysterproject.org